Designed for performance in demanding environments, Allied Pumpsโ industrial water tanks provide robust, high-capacity storage for both mines sites and process plants.
Manufactured to rigorous Australian Standards using corrosion-resistant materials, they are built to withstand extreme conditions.ย
With flexible configurations and capacities, these tanks can integrate efficiently with pumps to provide reliable water supply for potable, process, wastewater, and fire protection.
The tank jacks are equipped to every vertical joint around the tank.

All external fittings and accessories are installed once the tank is at specified height.
We were recently involved in supplying fire protection for Perth Airport. View the video to see the testing DFES conducted at the facilities in March 2017.
The Christmas Island International Airport serves visitors and residents of Christmas Island, a territory of Australia in the Indian Ocean. The building required a containerised system for its fire pump set. We were able to offer expert advice and help in the installation and usage of the system for the Christmas Island Airport personnel.
Canal Rocks Beachfront Resort sits waterfront at Smiths Beach in Yallingup. It offers beautiful accommodation for families, friends and couples visiting Yallingup and its surroundings. The facility required a fire pro pump set. We used the first AS2941-2013, which we designed, manufactured and installed the system, ensuring it met all standards and regulations. The project had its challenges since it was a first, however its successful completion enabled us to learn valuable information which will help in future installations. The project highlighted our ability to quickly learn on the job whilst successfully completing the project brief.
Allied Pumps has a long history with Busselton, and in particular the famous Busselton Jetty. In 2000 we supplied a sewage pump station – designed to hang underneath the jetty under the centre. 18 years later the system is still in good condition and is testament to the high quality product working as hard today as it was when it was installed. In addition to this sewage pump station, we also supplied a concrete pump station and sewage pump station at the Underwater Observatory. More recently we supplied pump stations for the on-shore discovery centre.
It’s been 25 years, and the Bickley Booster Pump Station is still going strong. In 1992, we took on this project. This challenge began with the need to solve a low-pressure problem in the Orange Grove area. A dual pump system operating on a variable speed control was installed. This included the base, pipework, valves, control system and pressure vessel. The pump set is still functioning correctly and addressing the original issue. This project represents the quality and endurance of our pump systems.
Located on the Burswood Peninsula, the Optus Stadium is part of a large redevelopment that has become a draw card to thousands of people. However, as with all new developments there was a significant change to the existing landscape. Part of the Optus Stadium is bounded by the Swan River and river traffic, some of the retaining walls and steel piles on the water’s edge which could be seen from the water and needed to be addressed which could not be achieved using a land based planting scheme or additional construction. Allied Pumps created an environmentally sound and sustainable floating treatment wetland that can be configured in rafts of endless configurations. They can fit any existing space or water body shape and can operate in fluctuating water levels which was an essential requirement for this project. While the floating treatment wetlands are primarily a water treatment tool, they have the added bonus of being visually appealing with the use of wetland sedges, rushes and grasses providing fast and easy to install beautification options.
The proposed fibreglass storage tank had an extended lead time of 14 weeks. To ensure schedules were kept, we recommended a galvanised tank, which was a first for us. This was an experience of trial and learning. Everything went smoothly providing the client with a viable solution within the requested timeframe.
Mundella was looking to reinvent an industrial filling system and outdated production line. The brief was to provide a food grade, fully compliant solution for the careful transfer of yoghurts and dairy products from vats, while maintaining constant and sensitive flow rates and meeting specific hygiene requirements. We engineered and manufactured an innovative solution to an outdated processing line using a mobile Wilden pumping package. Read on to find out how we achieved this.
Our client required new potable water and fire water storage tanks to be manufactured onsite. The location is particularly close to the harbour shoreline and situated in the category 5 cyclone region, which means winds can be in excess of 280 km per hr. This impacted every facet of design. We had extensive contact with suppliers to find alternative products that could withstand the aggressive environmental location. The process included a search for tank wall, nuts, and bolts all the way through to paints and roofing materials. We successfully installed all the equipment on schedule, within a 3 week period with no major disruptions or safety incidents. The tank construction was guaranteed for 25 years. The client was very satisfied with the end solution.
Formed in 1905 to obtain, treat and distribute water supplies, the Bunbury Water Board has served the people of Bunbury for over 100 years. The city’s early settlers knew of water stored naturally underground and tried to use it to replace the Collie River and the Preston River, which were the only sources of water for drinking in those days. We supplied the first variable speed system to the water authority. It’s still being used today.
A below-water-table mine in East Pilbara required rapid groundwater removal under strict site specs. Allied Pumps engineered six mobile bore headworks systems with telemetry and SCADA integration, enabling efficient dewatering while minimising disruption during active mining.
The remote Pilbara mine required 24/7 dewatering with limited access, high diesel use, and no power for controls. Allied Pumps supplied diesel transfer skids, a 5kL/62kL fuel system, and solar telemetry, enabling SCADA monitoring, lower fuel logistics, and reliable flow control.
Challenged with harsh Pilbara conditions and saline groundwater, the client needed a compliant bore field with SCADA integration. Allied Pumps delivered 24 skid-mounted systems with 316 stainless steel pumps and telemetry, completing installation in 24 weeks and enabling reliable raw water supply.
Allied Pumpsโ industrial water tanks are manufactured from panels made of galvanised steel, hot-dip galvanised steel, glass fused steel, and epoxy coated steel.
Sizing for Allied Pumpsโ industrial water tanks ranges from 10kL to 30ML. Please reach out to our team if you are looking for other sizes.
Yes, Allied Pumpsโ industrial water tanks are designed to meet Australian Standards like AS2304 (Fire Protection) and AS1170 (Wind Loads).
Applications for Allied Pumpsโ industrial water tanks include: fire protection, dust suppression, truck wash, potable water, raw water, wastewater, and industrial liquids.
Yes, Allied Pumpsโ industrial water tanks can be customised to be cyclone rated. We have completed many tank projects in regions affected by high wind loads and tropical cyclones.