Navigating limited access to the site resulted in some logistical issues and challenges regarding deliveries and installation. The challenge was overcome these given the limited space and busy neighborhood.
In the Pilbara region, water is stored in tanks that reach 40-50 degrees. Allied Pumps came up with a innovative solution to provide cool water, through a pressure system, to the region.
The design engineer of Vincent Street, Leederville was presented with substantial difficulties in achieving sufficient detention for stormwater generated by a new development. The completed design employed a single line of SPEL HDPE Stormchambers with a high-level entry from the syphonic roof drainage system and a high-level exit to an Allied Pumps Packaged Stormwater Pump Station.
Five ore trains per day operate from the Roy Hill Mine, each consisting of two diesel electric locomotives hauling 232 ore cars with a total payload of 31,132 tonnes of ore. Roy Hill needed large bulk diesel facilities to rapidly fuel all ore trains to meet production and delivery schedules.
The Perth City Link busport is reconnecting Northbridge with the city centre for the first time in over 100 years.
Specific areas of Island Point shoreline in Mandurah have become vulnerable to erosion caused by waves generated by strong easterly breezes. As a result, the City of Mandurah needed to coordinate a foreshore stabilisation scheme.
The Olympic Dam mine in South Australia, 550 km NNW of Adelaide was facing an issue. With winter approaching, there was a real risk to the amount of tonnage that could be mined if their bores weren't dewatered in time. Allied Pumps provided quick bespoke solution to their challenge.
Contact us to learn about how we can help you with your pump needs.