Our concrete tank liners are made from high-grade PVC, PE, or XR material, resulting in a soft, world-class product. Rigorous testing and product standards are regularly performed to ensure quality standards.
Low maintenance and cost-effective, our liners are proudly manufactured in Australia and offer a service life of 10 or more years depending on the type selected.ย
Liners are fully installed by Allied Pumps trained installers. Pipe connections are inserted, sealed and commissioned by our team, providing a warranted leak-free installation.
Our client required new potable water and fire water storage tanks to be manufactured onsite. The location is particularly close to the harbour shoreline and situated in the category 5 cyclone region, which means winds can be in excess of 280 km per hr. This impacted every facet of design. We had extensive contact with suppliers to find alternative products that could withstand the aggressive environmental location. The process included a search for tank wall, nuts, and bolts all the way through to paints and roofing materials. We successfully installed all the equipment on schedule, within a 3 week period with no major disruptions or safety incidents. The tank construction was guaranteed for 25 years. The client was very satisfied with the end solution.
The City of Subiaco had an initiative to improve water quality. The focus was on reducing pollutants in Lake Mabel Talbot. The lake is in the conservation category wetland under the Environment Protection policy and functions as a Water Corporation compensating basin. The lake collects rainfall runoff from four sub-catchments, totaling 300 ha. A Gross Pollutant Trap needed to treat the entire flow prior to entering the system, and our Baffle Box was the only system to appropriately meet the design criteria. The Baffle Box was able to catch leaves and other pollutants before they could enter the lake. The result of this project was cleaner water and an improvement in the water quality.
Royal Perth Hospital is a 450-bed teaching hospital located on the north-eastern edge of the CBD of Perth in Western Australia. The project started with a site visit by us. We measured and discussed the design needs for the fire pump set refurbishment. The first step was to disable and remove the existing system. This removal was the same day as the new system’s delivery so there was no site storage required. The new system was then installed in one day. This was a quick turnaround time, and we were able to meet the timeframe to ensure minimal downtime.
Station street markets were historic markets located in Subiaco that closed in 2015 after 30 years. In 2017, the site became part of a $96M redevelopment plan. We are currently working on this project constructing custom 4.70 diameter by 9.20 high fire water tanks (holding 150 kL each). These are custom specifications to meet the site’s needs. Creating custom length panels highlights our ingenuity and abilities to accommodate clients.
The Craft Street project involved 8 adjoining lots which required fire protection. To solve this problem, two (2) tanks measuring 5.12 m in diameter by 9.20 m high were assembled onsite and situated next to a fire pumpset in its own custom built enclosure. By collaborating, the owners of the 8 lots were able to share the costs and find a collective solution that worked for them. The short lead time was met and we were able to meet the client expectations in the provided timeframe.
Formed in 1905 to obtain, treat and distribute water supplies, the Bunbury Water Board has served the people of Bunbury for over 100 years. The city’s early settlers knew of water stored naturally underground and tried to use it to replace the Collie River and the Preston River, which were the only sources of water for drinking in those days. We supplied the first variable speed system to the water authority. It’s still being used today.
Allied Pumps creates insulated circular steel panel liner tank for the Karratha Health Campus to meet clients cold water requirements. We were able to meet the client’s stringent requirements to produce a cost effective, potable water tank that could withstand the extreme weather conditions. Rising to the challenge, this project was Allied Pumps first insulated circular steel panel liner tank complete with a cold water circulating program.
This job represented a challenge as the insurance company who are the insurers of the BUNGE Grain Terminal required that a pumpset built to a North American standard be used on the job, otherwise they would not grant insurance cover. Insurance cover was conditional upon compliance with a standard for the fire pump not commonly used in Australia. This meant that a fire pump had to be specially imported from North America to supply to the fire company fitting out the fire services on site. Allied Pumps were able to work with an overseas Supplier to arrange the build and testing of the fire pump off shore, in a factory in North America, then arrange airfreight of some very heavy packages at considerable cost in order to reduce time lost in transit, to minimise delays in the building construction deadline. A further challenge was that there is NO LOCAL BACK UP for the North American controllers. Allied Pumps was able to rise to the occasion and overcome this challenge by our highly experienced technicians making contact with an overseas electrical technician to gain the knowledge necessary to overcome certain control panel commissioning obstacles. A fine outcome on a very challenging job!
Allied Pumps rises to the challenge. Could we produce 20 relocatable bore head works, which could last for a minimum of 20 years and be compliant with wind loading requirements AS1170.2, for a wind region A4 quickly? Being headquarted in Western Australia, with extensive stock holdings, not only do we understand harsh conditions we were able to gear up quickly and meet the clients deadline.
We were recently involved in supplying fire protection for Perth Airport. View the video to see the testing DFES conducted at the facilities in March 2017.
Allied Pumps concrete tank liners are manufactured and tested in Australia to ensure the highest quality standards are met.ย
Allied Pumpsโ concrete tank liners are Made into a single piece PVC, PE, or XR reinforced impervious liner. Additionally, a geofabric material is fixed to the walls and floor to protect the liner from cracked or uneven concrete.
Yes, Allied Pumpsโ concrete tank liners are engineered to meet relevant Australian Standards, including fire protection (AS2304) and potable water (AS3500).
Yes, Allied Pumps install their concrete tank liners, including all required accessories like anti-vortex, valves, fittings, and more.
Allied Pumpsโ concrete tank liners can hold a variety of liquids, including potable water or fire water.