Built specifically for remote environments, our treatment plants are supplied as complete package solutions. They incorporate treatment equipment, pumps, pipework, controls, and even liquid storage if required.Â
Each water treatment plant is customised to meet your specific project requirements with our site team available for installation and integration.Â
A residential complex in Perth required an innovative way to pump water to reduce power consumption and improve sustainability. In many new buildings, there is a push to use a single basement tank with basement pumps pressuring all the way to the top of the apartment block. However, Allied Pumps had a better solution. A small pump and tank at the basement of the apartment block transfers water to the rooftop tanks at a low flow, keeping the rooftop tank full. A smaller, variable speed pump supplies the top few floors, whilst the levels below are fed by gravity. With a roof top tank full of water at all times, even during a power outage, the system can still supply the residents with water. Smaller pumps, simpler control logic, and reduced tank capacities all kept initial costs low and provided huge benefits for the complex.
Our client required new potable water and fire water storage tanks to be manufactured onsite. The location is particularly close to the harbour shoreline and situated in the category 5 cyclone region, which means winds can be in excess of 280 km per hr. This impacted every facet of design. We had extensive contact with suppliers to find alternative products that could withstand the aggressive environmental location. The process included a search for tank wall, nuts, and bolts all the way through to paints and roofing materials. We successfully installed all the equipment on schedule, within a 3 week period with no major disruptions or safety incidents. The tank construction was guaranteed for 25 years. The client was very satisfied with the end solution.
Located on the Burswood Peninsula, the Optus Stadium is part of a large redevelopment that has become a draw card to thousands of people. However, as with all new developments there was a significant change to the existing landscape. Part of the Optus Stadium is bounded by the Swan River and river traffic, some of the retaining walls and steel piles on the water’s edge which could be seen from the water and needed to be addressed which could not be achieved using a land based planting scheme or additional construction. Allied Pumps created an environmentally sound and sustainable floating treatment wetland that can be configured in rafts of endless configurations. They can fit any existing space or water body shape and can operate in fluctuating water levels which was an essential requirement for this project. While the floating treatment wetlands are primarily a water treatment tool, they have the added bonus of being visually appealing with the use of wetland sedges, rushes and grasses providing fast and easy to install beautification options.
Located on Connelly Street at the Greater Sports Ground is the new built recreation & leisure centre incorporating the Kellerberrin & Districts Club. This was the site of the first concrete pump station in Western Australia. When wastewater has to get to the treatment facility and gravity is not cooperating, precast concrete pump stations do the heavy lifting. Precast concrete pump stations are designed, fabricated and installed with the highest-quality materials and equipment. We installed this system in the early 1990s. Completing a project like shows how we adopt innovation in out techniques.
Due to the hot weather that is common throughout the year in the Pilbara region, water stored in potable water tanks can often reach temperatures in excess of 40 degrees. This is unacceptable for applications such drinking and eye wash stations and we needed to come up with a solution to accommodate this. We also provided the fire protection for a new Sino Iron Steel Warehouse in a tight 6 week deadline. Keep an eye out for the Fire Protection provided and find out more about the Eye Wash Station below.
The City of Subiaco had an initiative to improve water quality. The focus was on reducing pollutants in Lake Mabel Talbot. The lake is in the conservation category wetland under the Environment Protection policy and functions as a Water Corporation compensating basin. The lake collects rainfall runoff from four sub-catchments, totaling 300 ha. A Gross Pollutant Trap needed to treat the entire flow prior to entering the system, and our Baffle Box was the only system to appropriately meet the design criteria. The Baffle Box was able to catch leaves and other pollutants before they could enter the lake. The result of this project was cleaner water and an improvement in the water quality.
Formed in 1905 to obtain, treat and distribute water supplies, the Bunbury Water Board has served the people of Bunbury for over 100 years. The city’s early settlers knew of water stored naturally underground and tried to use it to replace the Collie River and the Preston River, which were the only sources of water for drinking in those days. We supplied the first variable speed system to the water authority. It’s still being used today.
This project was the result of a need to facilitate communication between two pump stations. One was located at Denmark High School; the other at Riverside Club. This project included supply, installation, and commission of control equipment. The objective was to pause the operation of the Riverside Club pump station when one of the pumps at the high school was operating. A dialler system was used to sync these two locations. We delivered the solution to connect these two systems which increased the efficiencies of the solutions.
Royal Perth Hospital is a 450-bed teaching hospital located on the north-eastern edge of the CBD of Perth in Western Australia. The project started with a site visit by us. We measured and discussed the design needs for the fire pump set refurbishment. The first step was to disable and remove the existing system. This removal was the same day as the new system’s delivery so there was no site storage required. The new system was then installed in one day. This was a quick turnaround time, and we were able to meet the timeframe to ensure minimal downtime.
Canal Rocks Beachfront Resort sits waterfront at Smiths Beach in Yallingup. It offers beautiful accommodation for families, friends and couples visiting Yallingup and its surroundings. The facility required a fire pro pump set. We used the first AS2941-2013, which we designed, manufactured and installed the system, ensuring it met all standards and regulations. The project had its challenges since it was a first, however its successful completion enabled us to learn valuable information which will help in future installations. The project highlighted our ability to quickly learn on the job whilst successfully completing the project brief.
Allied Pumps supplies a range of water treatment plants for mining non-process infrastructure, including potable water treatment systems, reverse osmosis (RO) plants, ultraviolet filtration systems, sewage treatment plants (STPs), greywater recycling systems, and wastewater treatment plants.
Yes, Allied Pumps can supply water treatment plants in containerised, skid-mounted, or modular configurations. These provide a compact, transportable solution that simplifies installation and commissioning on remote sites.
Yes, Allied Pumps designs and manufactures water treatment plants in accordance with relevant Australian Standards. Systems can also be tailored to meet site, environmental, and regulatory compliance requirements.
Yes, Allied Pumps supplies integrated control systems with its water treatment plants, including PLC-based controllers, instrumentation, and monitoring equipment.
Allied Pumps’ water treatment plants are used across non-process infrastructure such as mining camps, accommodation villages, workshops, administration buildings, and more.