Projects & Case Studies

Perth City Link Busport

Project
Overview

The Perth City Link busport is reconnecting Northbridge with the city centre for the first time in over 100 years.

About the Project

PROJECT : PERTH CITY LINK BUSPORT

Location : Wellington Street, Perth, Western Australia

BACKGROUND

The Perth City Link busport is reconnecting Northbridge with the city centre for the first time in over 100 years – extending from the Perth Station to the new Perth Arena.

The busport required sufficient water storage for protection against fire.

THE CHALLENGE

The facility is an underground bus terminal and buses have a certain level of risk of catching alight. The busportโ€™s design engineer faced substantial difficulties achieving sufficient fire water storage for fire protection in the underground terminal.

The challenge included:

  • The actual incoming water supply which determines the storage required was unknown
  • Changes to water supply over design phase would mean larger capacity fire pumps and tanks in a plant room that cannot be expanded
  • Underground plant control room, and
  • Installation in tight conditions.

HOW WE WERE APPROACHED

We have been involved in the Perth City Link busport project from the beginning, providing valuable support and advice to the hydraulic and fire consultants.

OUR SOLUTION

Drawing on an extensive resource of knowledge within the team we carefully analysed the minimum space requirements, the dimensions of each piece of equipment and design calculations to give our draftsman the constraints we had to work with. With this information we were able to redesign the room layout, pump skid configuration and the tank dimensions to meet the restraints of the room size.

Our solution was to implement our dual diesel fire protection pumpset, complete with suction and discharge manifolds, combined with dual rectangular steel liner panel tanks.We manufactured the complete fire pumps skid at our production facility, so they could be tested at our test facility. We then disassembled it so that it could be transported to site, where it needed to be carefully craned into place within a tunnel with a low ceiling height. Installing the tanks onsite was then a challenge in the tight confines of the underground plant room

THE OUTCOMES

We delivered a successful project outcome, with a sufficient amount of water that could be dumped in a short amount of time to douse the flames of any fire and, in turn, successfully protect the lives of many passengers.

With the tanks and fire pumps successfully installed in the tight plant room we were able to provide sufficient space to ensure accessibility would be achieved.

TESTIMONIALS

"Allied Pumps are always very easy and friendly to deal with. The turnaround is also excellent. "

Jeff - Maintenance Supervisor

TESTIMONIALS

"Great professional advice and service, RFQs are prompt and well presented."

Lourens - Senior Estimator

TESTIMONIALS

"Always fantastic customer service from the team plus quality products and workmanship."

Andrew - Procurement Manager

TESTIMONIALS

"The guys were really helpful and filled out Journey Management Plans and liaised with site and myself on when they would attend and approx times "

Jimmy - Plumbing Technician

TESTIMONIALS

"Quick response and always keen to provide solution."

Ted - Package Engineer

TESTIMONIALS

"Good follow through on the specifications and support with operational cost estimates "

Stephen - Production Manager

PROJECTS

Explore Other Projects

Speak to Our Team

We provide project-specific advice to help you select the best water solutions for your site. Get in touch with the Allied Pumps team today.