Designed for performance in demanding environments, Allied Pumps’ industrial water tanks provide robust, high-capacity storage for both mines sites and process plants.
Manufactured to rigorous Australian Standards using corrosion-resistant materials, they are built to withstand extreme conditions.Â
With flexible configurations and capacities, these tanks can integrate efficiently with pumps to provide reliable water supply for potable, process, wastewater, and fire protection.
The tank jacks are equipped to every vertical joint around the tank.

All external fittings and accessories are installed once the tank is at specified height.
The Craft Street project involved 8 adjoining lots which required fire protection. To solve this problem, two (2) tanks measuring 5.12 m in diameter by 9.20 m high were assembled onsite and situated next to a fire pumpset in its own custom built enclosure. By collaborating, the owners of the 8 lots were able to share the costs and find a collective solution that worked for them. The short lead time was met and we were able to meet the client expectations in the provided timeframe.
Allied Pumps rises to the challenge. Could we produce 20 relocatable bore head works, which could last for a minimum of 20 years and be compliant with wind loading requirements AS1170.2, for a wind region A4 quickly? Being headquarted in Western Australia, with extensive stock holdings, not only do we understand harsh conditions we were able to gear up quickly and meet the clients deadline.
Allied Pumps has a long history with Busselton, and in particular the famous Busselton Jetty. In 2000 we supplied a sewage pump station – designed to hang underneath the jetty under the centre. 18 years later the system is still in good condition and is testament to the high quality product working as hard today as it was when it was installed. In addition to this sewage pump station, we also supplied a concrete pump station and sewage pump station at the Underwater Observatory. More recently we supplied pump stations for the on-shore discovery centre.
Eastern Goldfields Regional Prison is an Australian prison located in Boulder, Western Australia, and opened in 1980. An upgrade to the fire pump skid and commissioning was necessary in 2014. The primary challenge was carrying out both tasks at the same time including upgrading and commissioning. We worked hard to balance both tasks resulting in a successful delivery of the project.
It’s been 25 years, and the Bickley Booster Pump Station is still going strong. In 1992, we took on this project. This challenge began with the need to solve a low-pressure problem in the Orange Grove area. A dual pump system operating on a variable speed control was installed. This included the base, pipework, valves, control system and pressure vessel. The pump set is still functioning correctly and addressing the original issue. This project represents the quality and endurance of our pump systems.
This job represented a challenge as the insurance company who are the insurers of the BUNGE Grain Terminal required that a pumpset built to a North American standard be used on the job, otherwise they would not grant insurance cover. Insurance cover was conditional upon compliance with a standard for the fire pump not commonly used in Australia. This meant that a fire pump had to be specially imported from North America to supply to the fire company fitting out the fire services on site. Allied Pumps were able to work with an overseas Supplier to arrange the build and testing of the fire pump off shore, in a factory in North America, then arrange airfreight of some very heavy packages at considerable cost in order to reduce time lost in transit, to minimise delays in the building construction deadline. A further challenge was that there is NO LOCAL BACK UP for the North American controllers. Allied Pumps was able to rise to the occasion and overcome this challenge by our highly experienced technicians making contact with an overseas electrical technician to gain the knowledge necessary to overcome certain control panel commissioning obstacles. A fine outcome on a very challenging job!
We were recently involved in supplying fire protection for Perth Airport. View the video to see the testing DFES conducted at the facilities in March 2017.
The Perth City Link bus port is reconnecting Northbridge with the city centre, extending from the Perth Station to the new Perth Arena. The bus port required sufficient water storage for protection against fire. Delivering water storage in an underground situation is challenging but necessary. We had several hurdles to overcome. Our ultimate solution was to recommend our dual diesel fire protection pump set. This included suction and discharge manifolds combined with dual rectangular steel liner panel tanks. We manufactured the complete fire pumps skid at our production facility, so they could be tested at our test facility. Installing the tanks onsite was then a challenge in the tight confines of the underground plant room. The successful outcome offered a sufficient amount of water that could be dumped quickly in the case of a sudden fire.
The proposed fibreglass storage tank had an extended lead time of 14 weeks. To ensure schedules were kept, we recommended a galvanised tank, which was a first for us. This was an experience of trial and learning. Everything went smoothly providing the client with a viable solution within the requested timeframe.
A below water table mine operation in the Shire of East Pilbara sustains the Newman Hub mining operations at a Western Australian iron ore mine site. The client needed an in-pit dewatering solution to discharge excess groundwater for a new section of the pit. The solution was required within eight weeks. A bore system using equipment that would suit their requirements was designed. We provided Kwikbore bore head works systems which were trailer-mounted. This would minimise dewatering and pumping downtime during removal of the existing equipment from the mining pit during blasting and installed the head works once the blasting was completed. Overall, six mobile head works systems were used, each featuring a unique plug and play design with remote telemetry system for integration with the site SCADA system. Our experienced technicians carried out onsite commissioning to effectively integrate the pumping systems into the BHP site-wide SCADA system. The project was delivered on time and on budget and operates to the specification set out in the scope of works.
A below-water-table mine in East Pilbara required rapid groundwater removal under strict site specs. Allied Pumps engineered six mobile bore headworks systems with telemetry and SCADA integration, enabling efficient dewatering while minimising disruption during active mining.
The remote Pilbara mine required 24/7 dewatering with limited access, high diesel use, and no power for controls. Allied Pumps supplied diesel transfer skids, a 5kL/62kL fuel system, and solar telemetry, enabling SCADA monitoring, lower fuel logistics, and reliable flow control.
Challenged with harsh Pilbara conditions and saline groundwater, the client needed a compliant bore field with SCADA integration. Allied Pumps delivered 24 skid-mounted systems with 316 stainless steel pumps and telemetry, completing installation in 24 weeks and enabling reliable raw water supply.
Allied Pumps’ industrial water tanks are manufactured from panels made of galvanised steel, hot-dip galvanised steel, glass fused steel, and epoxy coated steel.
Sizing for Allied Pumps’ industrial water tanks ranges from 10kL to 30ML. Please reach out to our team if you are looking for other sizes.
Yes, Allied Pumps’ industrial water tanks are designed to meet Australian Standards like AS2304 (Fire Protection) and AS1170 (Wind Loads).
Applications for Allied Pumps’ industrial water tanks include: fire protection, dust suppression, truck wash, potable water, raw water, wastewater, and industrial liquids.
Yes, Allied Pumps’ industrial water tanks can be customised to be cyclone rated. We have completed many tank projects in regions affected by high wind loads and tropical cyclones.