Projects & Case Studies
This job represented a challenge as the insurance company who are the insurers of the BUNGE Grain Terminal required that a pumpset built to a North American standard be used on the job, otherwise they would not grant insurance cover. Insurance cover was conditional upon compliance with a standard for the fire pump not commonly used in Australia. This meant that a fire pump had to be specially imported from North America to supply to the fire company fitting out the fire services on site. Allied Pumps were able to work with an overseas Supplier to arrange the build and testing of the fire pump off shore, in a factory in North America, then arrange airfreight of some very heavy packages at considerable cost in order to reduce time lost in transit, to minimise delays in the building construction deadline. A further challenge was that there is NO LOCAL BACK UP for the North American controllers. Allied Pumps was able to rise to the occasion and overcome this challenge by our highly experienced technicians making contact with an overseas electrical technician to gain the knowledge necessary to overcome certain control panel commissioning obstacles. A fine outcome on a very challenging job!
Five ore trains per day operate from the Roy Hill Mine, each consisting of two diesel electric locomotives hauling 232 ore cars with a total payload of 31,132 tonnes of ore. Roy Hill needed large bulk diesel facilities to rapidly fuel all ore trains to meet production and delivery schedules.
Discover how we installed five tanks in a remote offshore site affected by cyclonic winds and a highly corrosive marine atmosphere.
Learn how Allied Pumps created a solar powered dewatering solution for an iron ore mine
Multinational mining company impressed by Allied leads to supply them with bore head works systems for tackling water removal from a mining pit.
With a short lead time to supply a package wastewater pump station, the client knew Allied Pumps could supply the item on time and hassle free