Projects & Case Studies
It’s been 25 years, and the Bickley Booster Pump Station is still going strong. In 1992, we took on this project. This challenge began with the need to solve a low-pressure problem in the Orange Grove area. A dual pump system operating on a variable speed control was installed. This included the base, pipework, valves, control system and pressure vessel. The pump set is still functioning correctly and addressing the original issue. This project represents the quality and endurance of our pump systems.
Multinational mining company impressed by Allied leads to supply them with bore head works systems for tackling water removal from a mining pit.
With a short lead time to supply a package wastewater pump station, the client knew Allied Pumps could supply the item on time and hassle free
Discover how we installed five tanks in a remote offshore site affected by cyclonic winds and a highly corrosive marine atmosphere.
Learn how Allied Pumps created a solar powered dewatering solution for an iron ore mine
Five ore trains per day operate from the Roy Hill Mine, each consisting of two diesel electric locomotives hauling 232 ore cars with a total payload of 31,132 tonnes of ore. Roy Hill needed large bulk diesel facilities to rapidly fuel all ore trains to meet production and delivery schedules.