Our standard Levikos model uses a level sensors to provide empty, half, and full level readings, with volt-free contacts available for remote monitoring.
The upgraded version provides single or dual tank monitoring and includes features like tank level indication, system monitoring, remote alarm outputs, digital liquid level display, and optional communications.
It’s been 25 years, and the Bickley Booster Pump Station is still going strong. In 1992, we took on this project. This challenge began with the need to solve a low-pressure problem in the Orange Grove area. A dual pump system operating on a variable speed control was installed. This included the base, pipework, valves, control system and pressure vessel. The pump set is still functioning correctly and addressing the original issue. This project represents the quality and endurance of our pump systems.
Allied Pumps has a long history with Busselton, and in particular the famous Busselton Jetty. In 2000 we supplied a sewage pump station – designed to hang underneath the jetty under the centre. 18 years later the system is still in good condition and is testament to the high quality product working as hard today as it was when it was installed. In addition to this sewage pump station, we also supplied a concrete pump station and sewage pump station at the Underwater Observatory. More recently we supplied pump stations for the on-shore discovery centre.
Located on Connelly Street at the Greater Sports Ground is the new built recreation & leisure centre incorporating the Kellerberrin & Districts Club. This was the site of the first concrete pump station in Western Australia. When wastewater has to get to the treatment facility and gravity is not cooperating, precast concrete pump stations do the heavy lifting. Precast concrete pump stations are designed, fabricated and installed with the highest-quality materials and equipment. We installed this system in the early 1990s. Completing a project like shows how we adopt innovation in out techniques.
A residential complex in Perth required an innovative way to pump water to reduce power consumption and improve sustainability. In many new buildings, there is a push to use a single basement tank with basement pumps pressuring all the way to the top of the apartment block. However, Allied Pumps had a better solution. A small pump and tank at the basement of the apartment block transfers water to the rooftop tanks at a low flow, keeping the rooftop tank full. A smaller, variable speed pump supplies the top few floors, whilst the levels below are fed by gravity. With a roof top tank full of water at all times, even during a power outage, the system can still supply the residents with water. Smaller pumps, simpler control logic, and reduced tank capacities all kept initial costs low and provided huge benefits for the complex.
The City of Subiaco had an initiative to improve water quality. The focus was on reducing pollutants in Lake Mabel Talbot. The lake is in the conservation category wetland under the Environment Protection policy and functions as a Water Corporation compensating basin. The lake collects rainfall runoff from four sub-catchments, totaling 300 ha. A Gross Pollutant Trap needed to treat the entire flow prior to entering the system, and our Baffle Box was the only system to appropriately meet the design criteria. The Baffle Box was able to catch leaves and other pollutants before they could enter the lake. The result of this project was cleaner water and an improvement in the water quality.
Canal Rocks Beachfront Resort sits waterfront at Smiths Beach in Yallingup. It offers beautiful accommodation for families, friends and couples visiting Yallingup and its surroundings. The facility required a fire pro pump set. We used the first AS2941-2013, which we designed, manufactured and installed the system, ensuring it met all standards and regulations. The project had its challenges since it was a first, however its successful completion enabled us to learn valuable information which will help in future installations. The project highlighted our ability to quickly learn on the job whilst successfully completing the project brief.
Eastern Goldfields Regional Prison is an Australian prison located in Boulder, Western Australia, and opened in 1980. An upgrade to the fire pump skid and commissioning was necessary in 2014. The primary challenge was carrying out both tasks at the same time including upgrading and commissioning. We worked hard to balance both tasks resulting in a successful delivery of the project.
The Roy Hill railway is a 344km standard gauge, single line, heavy haul railway built to transport 55Mtpa of iron ore from the Roy Hill Mine to the Port stockyard facility, in the Boodarie Industrial Estate south of Port Hedland. This operation uses a lot of diesel and was in need of a large bulk diesel facility to rapidly fuel the trains to meet production and delivery demands. This would allow them to function more efficiently. Nothing of this nature had ever been accomplished. Traditionally fuel facilities have pumps for unloading, loading and other refuelling activities located around the site and are wired back to a Motor Control Centre building. Our solution was to consolidate the pumping, compressed air equipment and Motor Control Centre onto a single super skid. The skid was pre-fabricated, assembled and tested at our facility and lifted into place on site where only a single lift was required. The project was delivered on time and as requested.
Due to the hot weather that is common throughout the year in the Pilbara region, water stored in potable water tanks can often reach temperatures in excess of 40 degrees. This is unacceptable for applications such drinking and eye wash stations and we needed to come up with a solution to accommodate this. We also provided the fire protection for a new Sino Iron Steel Warehouse in a tight 6 week deadline. Keep an eye out for the Fire Protection provided and find out more about the Eye Wash Station below.
Allied Pumps recently provided 2 Circular Colour Finished Steel Water Storage Tanks to a client near the edge of the water at the Kwinana Bulk Jetty. This area of Cockburn Sound is of significant economic and social importance as it facilitates trade to Western Australia and the nation. It is also subjected to very high winds (almost cyclonic during bad weather events) so special design considerations had to be incorporated into the tank design and construction. The tanks were constructed to 3mm in thickness all over (instead of the normal 3mm on the bottom strake and 1.95mm on the others). The tanks were fitted with harness points on the roof and installed with 2 SWAH doors per tank (normally one). The tanks were also powder coated in colorbond Off White finish to fit in with the surroundings.
The standard Levikos is a simple tank controller that uses floatswitch level detection for empty, half, and full level readings. The upgraded Levikos is a more advanced single or dual tank level management system with options for remote monitoring, transducer inputs, and communications.
Yes, the upgraded Levikos controller can handle single and dual tank monitoring.
Yes, the standard Levikos provides volt-free contacts for full, half, and empty levels, while the upgraded Levikos supports remote alarm outputs and optional communications for monitoring integration.
The standard Levikos uses floatswitch level detection, while the upgraded Levikos can use ultrasonic or pressure transducer instrumentation depending on the application and configuration.
Yes, the upgraded Levikos can support remote monitoring via Serial RS485 Modbus RTU communication or Ethernet TCP/IP.