The Roy Hill railway is a 344km standard gauge, single line, heavy haul railway built to transport 55Mtpa of iron ore from the Roy Hill Mine to the Port stockyard facility, in the Boodarie Industrial Estate south of Port Hedland. This operation uses a lot of diesel and was in need of a large bulk diesel facility to rapidly fuel the trains to meet production and delivery demands. This would allow them to function more efficiently. Nothing of this nature had ever been accomplished. Traditionally fuel facilities have pumps for unloading, loading and other refuelling activities located around the site and are wired back to a Motor Control Centre building. Our solution was to consolidate the pumping, compressed air equipment and Motor Control Centre onto a single super skid. The skid was pre-fabricated, assembled and tested at our facility and lifted into place on site where only a single lift was required. The project was delivered on time and as requested.
Learn how Allied Pumps created a solar powered dewatering solution for an iron ore mine
Multinational mining company impressed by Allied leads to supply them with bore head works systems for tackling water removal from a mining pit.
With a short lead time to supply a package wastewater pump station, the client knew Allied Pumps could supply the item on time and hassle free
Discover how we installed five tanks in a remote offshore site affected by cyclonic winds and a highly corrosive marine atmosphere.
Five ore trains per day operate from the Roy Hill Mine, each consisting of two diesel electric locomotives hauling 232 ore cars with a total payload of 31,132 tonnes of ore. Roy Hill needed large bulk diesel facilities to rapidly fuel all ore trains to meet production and delivery schedules.