Allied Pumpsโ hot water circulation systems are automated twin-pump packages designed to reduce energy consumption while maintaining a consistent-temperature hot water supply.
The complete unit incorporates pumps mounted on a common base with interconnecting pipework, valves, sensors, and associated components. Each package is pre-tested to ensure component compatibility and help eliminate incorrect installation.
By simplifying site installation and reducing the need to coordinate multiple trades, the system can help lower overall project costs.
The City of Subiaco had an initiative to improve water quality. The focus was on reducing pollutants in Lake Mabel Talbot. The lake is in the conservation category wetland under the Environment Protection policy and functions as a Water Corporation compensating basin. The lake collects rainfall runoff from four sub-catchments, totaling 300 ha. A Gross Pollutant Trap needed to treat the entire flow prior to entering the system, and our Baffle Box was the only system to appropriately meet the design criteria. The Baffle Box was able to catch leaves and other pollutants before they could enter the lake. The result of this project was cleaner water and an improvement in the water quality.
The Craft Street project involved 8 adjoining lots which required fire protection. To solve this problem, two (2) tanks measuring 5.12 m in diameter by 9.20 m high were assembled onsite and situated next to a fire pumpset in its own custom built enclosure. By collaborating, the owners of the 8 lots were able to share the costs and find a collective solution that worked for them. The short lead time was met and we were able to meet the client expectations in the provided timeframe.
Allied Pumps rises to the challenge. Could we produce 20 relocatable bore head works, which could last for a minimum of 20 years and be compliant with wind loading requirements AS1170.2, for a wind region A4 quickly? Being headquarted in Western Australia, with extensive stock holdings, not only do we understand harsh conditions we were able to gear up quickly and meet the clients deadline.
Blockages occur fairly regularly at Graylands Hospital, Western Australia’s largest mental health facility. Objects and clothing were often being introduced into the plumbing system. With 1,053 fixtures, the system needed help breaking up these foreign objects. Two of their grinder pumps were not properly handling foreign objects. After much investigation, the most practical option was to install a channel grinder in the existing mechanical screening pit. We designed specialised guiderails from 316 stainless steel. They were built in-house to suit the existing concrete structure. This solved the issue and eliminated peak flow blockages. The system has now been up and running for 24 months with no issues.
A below water table mine operation in the Shire of East Pilbara sustains the Newman Hub mining operations at a Western Australian iron ore mine site. The client needed an in-pit dewatering solution to discharge excess groundwater for a new section of the pit. The solution was required within eight weeks. A bore system using equipment that would suit their requirements was designed. We provided Kwikbore bore head works systems which were trailer-mounted. This would minimise dewatering and pumping downtime during removal of the existing equipment from the mining pit during blasting and installed the head works once the blasting was completed. Overall, six mobile head works systems were used, each featuring a unique plug and play design with remote telemetry system for integration with the site SCADA system. Our experienced technicians carried out onsite commissioning to effectively integrate the pumping systems into the BHP site-wide SCADA system. The project was delivered on time and on budget and operates to the specification set out in the scope of works.
Royal Perth Hospital is a 450-bed teaching hospital located on the north-eastern edge of the CBD of Perth in Western Australia. The project started with a site visit by us. We measured and discussed the design needs for the fire pump set refurbishment. The first step was to disable and remove the existing system. This removal was the same day as the new system’s delivery so there was no site storage required. The new system was then installed in one day. This was a quick turnaround time, and we were able to meet the timeframe to ensure minimal downtime.
Allied Pumps recently provided 2 Circular Colour Finished Steel Water Storage Tanks to a client near the edge of the water at the Kwinana Bulk Jetty. This area of Cockburn Sound is of significant economic and social importance as it facilitates trade to Western Australia and the nation. It is also subjected to very high winds (almost cyclonic during bad weather events) so special design considerations had to be incorporated into the tank design and construction. The tanks were constructed to 3mm in thickness all over (instead of the normal 3mm on the bottom strake and 1.95mm on the others). The tanks were fitted with harness points on the roof and installed with 2 SWAH doors per tank (normally one). The tanks were also powder coated in colorbond Off White finish to fit in with the surroundings.
The Australian Embassy in Jakarta, Indonesia required a water supply system. Because of its location, this was a very unique project. The spec required the materials to be stainless steel and fibreglass to resist corrosion. The site also needed a controller to monitor and operate water supply valves to fill tanks for use at the building. The three water supplies were the result of rainwater runoff from the roof, bore pumps and mains piping. To ensure that the specs were met, the valves were programmed to operate depending on the supply availability. The competing requirements of this project as well as working in a foreign environment created a number of challenges. We were able to rise to the challenge, through our strong organisational skills and execution of work.
The National Anzac Centre is one of Australia’s most important cultural pilgrimages. Located within Albany’s heritage listed Princess Royal Fortress, the centre overlooks the actual harbour from which over 41,000 men and woman departed Australia for the Great War. The project required a complete sewage system in a short amount of time. The system needed to handle minimal sewage flow but be prepared for high peak loadings. This is often hard to deliver, but our systems delivered a solution to ensure optimal operation.
The Cockburn Central Police Station required several tank and pump solutions. Initially a galvanised regular tank was recommended. However, there were design issues with the concrete slab. The station requested an in-situ concrete tank liner. The design was changed to meet this need. Allied Pumps was able to provide a turnkey solution for our client on this project, saving the client from having to engage the services of several different sub-contractors to work on various aspects of the tank installation. This enable the client to place a single order with us for all the work on the tank and supply of the pumping systems, enabling him to focus on other aspects of the project. The final project consisted of a panel tank, circulating pump pack, hot water circulator, fire pump and tank liner pack. The result was a seamless integration between the pumps and the tanks, and reliable fire protection has been the overall outcome.
Allied Pumps packaged hot water circulating system includes pumps mounted on a base together with interconnecting pipework, valves, sensors, and associated components. The system is pre-tested to ensure component compatibility before installation.
Where site limitations prevent installation of the full hot water circulating system, Allied Pumps can provide a pump system consisting of dual pumps with unions, cord & plug, and a controller.
Yes, an option is available for the packaged hot water circulation system to be supplied inside a heavy-duty, lockable metal weatherproof enclosure.
Allied Pumpsโ hot water circulating system provides temperature or timer control, automatic pump alternation and a duty override selector. Plug-in control is also provided to simplify installation.
Yes, Allied Pumpsโ hot water circulating system is certified to WMTS 103:2016.