Projects & Case Studies
Blockages occur fairly regularly at Graylands Hospital, Western Australia’s largest mental health facility. Objects and clothing were often being introduced into the plumbing system. With 1,053 fixtures, the system needed help breaking up these foreign objects. Two of their grinder pumps were not properly handling foreign objects. After much investigation, the most practical option was to install a channel grinder in the existing mechanical screening pit. We designed specialised guiderails from 316 stainless steel. They were built in-house to suit the existing concrete structure. This solved the issue and eliminated peak flow blockages. The system has now been up and running for 24 months with no issues.
Multinational mining company impressed by Allied leads to supply them with bore head works systems for tackling water removal from a mining pit.
Learn how Allied Pumps created a solar powered dewatering solution for an iron ore mine
With a short lead time to supply a package wastewater pump station, the client knew Allied Pumps could supply the item on time and hassle free
Five ore trains per day operate from the Roy Hill Mine, each consisting of two diesel electric locomotives hauling 232 ore cars with a total payload of 31,132 tonnes of ore. Roy Hill needed large bulk diesel facilities to rapidly fuel all ore trains to meet production and delivery schedules.
Discover how we installed five tanks in a remote offshore site affected by cyclonic winds and a highly corrosive marine atmosphere.