Water

Storage Tanks
At Allied Pumps, we manufacture and install water storage tanks for a variety of applications, such as fire protection, truck wash facilities, potable water storage, and many more.
OVERVIEW
Overview Heading
Our mining and industrial water tanks are designed to meet Australian Standards and can be customised to suit your site’s specific requirements.

All our water storage tanks are built from heavy-gauge steel, making them robust and long-lasting. The galvanised tanks come in capacities ranging from 10 kL to 5 ML and are available with insulation to cater to the hottest climates.

The Allied Pumps team has the capability to install and serve the remotest of locations, with many of our liner tank jobs taking place in the Pilbara and Goldfields. Moreover, all our mining and industrial water tanks are independently Engineer Certified to ensure they meet the highest of standards.
MINING
Our Water Tanks
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
A durable and impact resistant above ground polyethylene or glass reinforced plastic corrugated tank for collecting and storing water. Allied
Allied Pumps’ Polyethylene Underground Retention Tanks are tough, versatile liquid storage systems that have a standard capacity range from 5,000
Allied Pumps’ GRP Panel Type Water Storage tanks are manufactured from SMC using the hot pressed metal matched mould method
Our Tank Materials & Finishes
At Allied Pumps, we only use the most durable materials for our water storage tanks. Corrosion resistance is at the focus of our work, especially when designing steel tanks for liquids like raw and salt water. Our selection of tanks materials and finishes includes:
Applications
- Fire Protection
- Dust Suppression
- Truck Wash
- Potable Water
- Raw Water
- Sewage
- Wastewater
Australian Standards
AS2304-2011
Water storage tanks for fire protection systems
AS1657-2013
Fixed platforms, walkways, stairways, and ladders
AS4100
Steel structures
AS4600
Cold form steel structure
AS1170.4
Earthquake loads
AS2118
Raw sprinkler systems
AS/NZS4020
Testing of products for use in contact with drinking water
AS2239
Galvanic (sacrificial) anodes for cathodic protection
AS1170.2
Wind loads
AS2419.1
Raw hydrant (tanks)
AS1170.1
Live and dead loads
HOW IT WORKS
Our Tank
Installation Process
Our steel water tanks are fabricated at our manufacturing facilities and delivered to the site for installation. To minimise the risk of working at height, the platforms, top access hatch, and tank roof are built after the first ring/strake of the tank is complete.


The galvanised tanks are then lifted using electric jacks to the specified height.
Step 1
Tank Jacks are fitted to every vertical joint
around the tank.
Step 2
Tanks are lifted to a suitable height to enable working inside tank.

Step 3
All external fittings and accessories fitted once tank is at specified height.
PROJECTS
Explore Other Projects
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
The Cockburn Central Police Station required several tank and pump solutions. Initially a galvanised regular tank was recommended. However, there were design issues with the concrete slab. The station requested an in-situ concrete tank liner. The design was changed to meet this need. Allied Pumps was able to provide a turnkey solution for our client on this project, saving the client from having to engage the services of several different sub-contractors to work on various aspects of the tank installation. This enable the client to place a single order with us for all the work on the tank and supply of the pumping systems, enabling him to focus on other aspects of the project. The final project consisted of a panel tank, circulating pump pack, hot water circulator, fire pump and tank liner pack. The result was a seamless integration between the pumps and the tanks, and reliable fire protection has been the overall outcome.
Mundella was looking to reinvent an industrial filling system and outdated production line. The brief was to provide a food grade, fully compliant solution for the careful transfer of yoghurts and dairy products from vats, while maintaining constant and sensitive flow rates and meeting specific hygiene requirements. We engineered and manufactured an innovative solution to an outdated processing line using a mobile Wilden pumping package. Read on to find out how we achieved this.
This job represented a challenge as the insurance company who are the insurers of the BUNGE Grain Terminal required that a pumpset built to a North American standard be used on the job, otherwise they would not grant insurance cover. Insurance cover was conditional upon compliance with a standard for the fire pump not commonly used in Australia. This meant that a fire pump had to be specially imported from North America to supply to the fire company fitting out the fire services on site. Allied Pumps were able to work with an overseas Supplier to arrange the build and testing of the fire pump off shore, in a factory in North America, then arrange airfreight of some very heavy packages at considerable cost in order to reduce time lost in transit, to minimise delays in the building construction deadline. A further challenge was that there is NO LOCAL BACK UP for the North American controllers. Allied Pumps was able to rise to the occasion and overcome this challenge by our highly experienced technicians making contact with an overseas electrical technician to gain the knowledge necessary to overcome certain control panel commissioning obstacles. A fine outcome on a very challenging job!
Due to the hot weather that is common throughout the year in the Pilbara region, water stored in potable water tanks can often reach temperatures in excess of 40 degrees. This is unacceptable for applications such drinking and eye wash stations and we needed to come up with a solution to accommodate this. We also provided the fire protection for a new Sino Iron Steel Warehouse in a tight 6 week deadline. Keep an eye out for the Fire Protection provided and find out more about the Eye Wash Station below.
We were recently involved in supplying fire protection for Perth Airport. View the video to see the testing DFES conducted at the facilities in March 2017.
It’s been 25 years, and the Bickley Booster Pump Station is still going strong. In 1992, we took on this project. This challenge began with the need to solve a low-pressure problem in the Orange Grove area. A dual pump system operating on a variable speed control was installed. This included the base, pipework, valves, control system and pressure vessel. The pump set is still functioning correctly and addressing the original issue. This project represents the quality and endurance of our pump systems.
The Christmas Island International Airport serves visitors and residents of Christmas Island, a territory of Australia in the Indian Ocean. The building required a containerised system for its fire pump set. We were able to offer expert advice and help in the installation and usage of the system for the Christmas Island Airport personnel.
Allied Pumps recently provided 2 Circular Colour Finished Steel Water Storage Tanks to a client near the edge of the water at the Kwinana Bulk Jetty. This area of Cockburn Sound is of significant economic and social importance as it facilitates trade to Western Australia and the nation. It is also subjected to very high winds (almost cyclonic during bad weather events) so special design considerations had to be incorporated into the tank design and construction. The tanks were constructed to 3mm in thickness all over (instead of the normal 3mm on the bottom strake and 1.95mm on the others). The tanks were fitted with harness points on the roof and installed with 2 SWAH doors per tank (normally one). The tanks were also powder coated in colorbond Off White finish to fit in with the surroundings.
The Perth City Link bus port is reconnecting Northbridge with the city centre, extending from the Perth Station to the new Perth Arena. The bus port required sufficient water storage for protection against fire. Delivering water storage in an underground situation is challenging but necessary. We had several hurdles to overcome. Our ultimate solution was to recommend our dual diesel fire protection pump set. This included suction and discharge manifolds combined with dual rectangular steel liner panel tanks. We manufactured the complete fire pumps skid at our production facility, so they could be tested at our test facility. Installing the tanks onsite was then a challenge in the tight confines of the underground plant room. The successful outcome offered a sufficient amount of water that could be dumped quickly in the case of a sudden fire.
Eastern Goldfields Regional Prison is an Australian prison located in Boulder, Western Australia, and opened in 1980. An upgrade to the fire pump skid and commissioning was necessary in 2014. The primary challenge was carrying out both tasks at the same time including upgrading and commissioning. We worked hard to balance both tasks resulting in a successful delivery of the project.






















































![[Pyrokos] Fire Pump Controller](https://alliedpumps.com.au/wp-content/uploads/2020/06/Pyrokos-Fire-Pump-Controller-768x512.jpg.webp)