Bickley Booster Pump Station

24 years later and most of the Bickley Booster pumpset is the original

Bickley Booster Pump Station

In October 1992 Allied Pumps were approached by Peter Scott to solve a low-pressure challenge in the Orange Grove area. The client required a pump duty of 8.0L/sec @ 37m boost.

In 1993 a pump system comprising of dual pumps operating on a variable speed control was supplied as a complete package with base, pipework, valves, control system and pressure vessel.

24 years later and most of the pumpset is original. The system is still in action – a testament to the quality and longevity that comes with our products.

Would you like to know more about our water pressure system products?ย Please contact the team at Allied Pumps today

Speak to Our Team

We provide project-specific advice to help you select the best water solutions for your site. Get in touch with the Allied Pumps team today.

NEWS

Updates