The proposed fibreglass storage tank had an extended lead time of 14 weeks. To ensure schedules were kept, we recommended a galvanised tank, which was a first for us. This was an experience of trial and learning. Everything went smoothly providing the client with a viable solution within the requested timeframe.
Multinational mining company impressed by Allied leads to supply them with bore head works systems for tackling water removal from a mining pit.
Discover how we installed five tanks in a remote offshore site affected by cyclonic winds and a highly corrosive marine atmosphere.
Learn how Allied Pumps created a solar powered dewatering solution for an iron ore mine
Five ore trains per day operate from the Roy Hill Mine, each consisting of two diesel electric locomotives hauling 232 ore cars with a total payload of 31,132 tonnes of ore. Roy Hill needed large bulk diesel facilities to rapidly fuel all ore trains to meet production and delivery schedules.
With a short lead time to supply a package wastewater pump station, the client knew Allied Pumps could supply the item on time and hassle free