At Allied Pumps, we manufacture and install water storage tanks for a variety of applications, such as fire protection, truck wash facilities, potable water storage, and many more.
OVERVIEW
Overview Heading
Our mining and industrial water tanks are designed to meet Australian Standards and can be customised to suit your site’s specific requirements.

All our water storage tanks are built from heavy-gauge steel, making them robust and long-lasting. The galvanised tanks come in capacities ranging from 10 kL to 5 ML and are available with insulation to cater to the hottest climates.

The Allied Pumps team has the capability to install and serve the remotest of locations, with many of our liner tank jobs taking place in the Pilbara and Goldfields. Moreover, all our mining and industrial water tanks are independently Engineer Certified to ensure they meet the highest of standards.
MINING
Our Water Tanks
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
A durable and impact resistant above ground polyethylene or glass reinforced plastic corrugated tank for collecting and storing water. Allied
Allied Pumps’ Polyethylene Underground Retention Tanks are tough, versatile liquid storage systems that have a standard capacity range from 5,000
Allied Pumps’ GRP Panel Type Water Storage tanks are manufactured from SMC using the hot pressed metal matched mould method
Our Tank Materials & Finishes
At Allied Pumps, we only use the most durable materials for our water storage tanks. Corrosion resistance is at the focus of our work, especially when designing steel tanks for liquids like raw and salt water. Our selection of tanks materials and finishes includes:
Applications
- Fire Protection
- Dust Suppression
- Truck Wash
- Potable Water
- Raw Water
- Sewage
- Wastewater
Australian Standards
AS2304-2011
Water storage tanks for fire protection systems
AS1657-2013
Fixed platforms, walkways, stairways, and ladders
AS4100
Steel structures
AS4600
Cold form steel structure
AS1170.4
Earthquake loads
AS2118
Raw sprinkler systems
AS/NZS4020
Testing of products for use in contact with drinking water
AS2239
Galvanic (sacrificial) anodes for cathodic protection
AS1170.2
Wind loads
AS2419.1
Raw hydrant (tanks)
AS1170.1
Live and dead loads
HOW IT WORKS
Our Tank
Installation Process
Our steel water tanks are fabricated at our manufacturing facilities and delivered to the site for installation. To minimise the risk of working at height, the platforms, top access hatch, and tank roof are built after the first ring/strake of the tank is complete.


The galvanised tanks are then lifted using electric jacks to the specified height.
Step 1
Tank Jacks are fitted to every vertical joint
around the tank.
Step 2
Tanks are lifted to a suitable height to enable working inside tank.

Step 3
All external fittings and accessories fitted once tank is at specified height.
PROJECTS
Explore Other Projects
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
It’s been 25 years, and the Bickley Booster Pump Station is still going strong. In 1992, we took on this project. This challenge began with the need to solve a low-pressure problem in the Orange Grove area. A dual pump system operating on a variable speed control was installed. This included the base, pipework, valves, control system and pressure vessel. The pump set is still functioning correctly and addressing the original issue. This project represents the quality and endurance of our pump systems.
Allied Pumps creates insulated circular steel panel liner tank for the Karratha Health Campus to meet clients cold water requirements. We were able to meet the client’s stringent requirements to produce a cost effective, potable water tank that could withstand the extreme weather conditions. Rising to the challenge, this project was Allied Pumps first insulated circular steel panel liner tank complete with a cold water circulating program.
The proposed fibreglass storage tank had an extended lead time of 14 weeks. To ensure schedules were kept, we recommended a galvanised tank, which was a first for us. This was an experience of trial and learning. Everything went smoothly providing the client with a viable solution within the requested timeframe.
The Christmas Island International Airport serves visitors and residents of Christmas Island, a territory of Australia in the Indian Ocean. The building required a containerised system for its fire pump set. We were able to offer expert advice and help in the installation and usage of the system for the Christmas Island Airport personnel.
A residential complex in Perth required an innovative way to pump water to reduce power consumption and improve sustainability. In many new buildings, there is a push to use a single basement tank with basement pumps pressuring all the way to the top of the apartment block. However, Allied Pumps had a better solution. A small pump and tank at the basement of the apartment block transfers water to the rooftop tanks at a low flow, keeping the rooftop tank full. A smaller, variable speed pump supplies the top few floors, whilst the levels below are fed by gravity. With a roof top tank full of water at all times, even during a power outage, the system can still supply the residents with water. Smaller pumps, simpler control logic, and reduced tank capacities all kept initial costs low and provided huge benefits for the complex.
This project was the result of a need to facilitate communication between two pump stations. One was located at Denmark High School; the other at Riverside Club. This project included supply, installation, and commission of control equipment. The objective was to pause the operation of the Riverside Club pump station when one of the pumps at the high school was operating. A dialler system was used to sync these two locations. We delivered the solution to connect these two systems which increased the efficiencies of the solutions.
We were recently involved in supplying fire protection for Perth Airport. View the video to see the testing DFES conducted at the facilities in March 2017.
Allied Pumps rises to the challenge. Could we produce 20 relocatable bore head works, which could last for a minimum of 20 years and be compliant with wind loading requirements AS1170.2, for a wind region A4 quickly? Being headquarted in Western Australia, with extensive stock holdings, not only do we understand harsh conditions we were able to gear up quickly and meet the clients deadline.
A below water table mine operation in the Shire of East Pilbara sustains the Newman Hub mining operations at a Western Australian iron ore mine site. The client needed an in-pit dewatering solution to discharge excess groundwater for a new section of the pit. The solution was required within eight weeks. A bore system using equipment that would suit their requirements was designed. We provided Kwikbore bore head works systems which were trailer-mounted. This would minimise dewatering and pumping downtime during removal of the existing equipment from the mining pit during blasting and installed the head works once the blasting was completed. Overall, six mobile head works systems were used, each featuring a unique plug and play design with remote telemetry system for integration with the site SCADA system. Our experienced technicians carried out onsite commissioning to effectively integrate the pumping systems into the BHP site-wide SCADA system. The project was delivered on time and on budget and operates to the specification set out in the scope of works.
The Australian Embassy in Jakarta, Indonesia required a water supply system. Because of its location, this was a very unique project. The spec required the materials to be stainless steel and fibreglass to resist corrosion. The site also needed a controller to monitor and operate water supply valves to fill tanks for use at the building. The three water supplies were the result of rainwater runoff from the roof, bore pumps and mains piping. To ensure that the specs were met, the valves were programmed to operate depending on the supply availability. The competing requirements of this project as well as working in a foreign environment created a number of challenges. We were able to rise to the challenge, through our strong organisational skills and execution of work.



















































![[Pyrokos] Fire Pump Controller](https://alliedpumps.com.au/wp-content/uploads/2020/06/Pyrokos-Fire-Pump-Controller-768x512.jpg.webp)